#7900. Integrating critical chain project management with last planner system for linear scheduling of modular construction
October 2026 | publication date |
Proposal available till | 31-05-2025 |
4 total number of authors per manuscript | 0 $ |
The title of the journal is available only for the authors who have already paid for |
|
|
Journal’s subject area: |
Architecture;
Building and Construction;
Computer Science (all);
Civil and Structural Engineering;
Control and Systems Engineering; |
Places in the authors’ list:
1 place - free (for sale)
2 place - free (for sale)
3 place - free (for sale)
4 place - free (for sale)
Abstract:
The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction. The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration.
Keywords:
BIM; Critical chain project management; Last planner system; Lean construction; Linear scheduling method; Repetitive scheduling
Contacts :