#7889. Risk Factor Identification and Evaluation on SPB Shield Underneath Existing Railroad Settlement

October 2026publication date
Proposal available till 30-05-2025
4 total number of authors per manuscript0 $

The title of the journal is available only for the authors who have already paid for
Journal’s subject area:
Architecture;
Geology;
Geotechnical Engineering and Engineering Geology;
Soil Science;
Places in the authors’ list:
place 1place 2place 3place 4
FreeFreeFreeFree
2350 $1200 $1050 $900 $
Contract7889.1 Contract7889.2 Contract7889.3 Contract7889.4
1 place - free (for sale)
2 place - free (for sale)
3 place - free (for sale)
4 place - free (for sale)

Abstract:
Regarding the situation of slurry pressure shield tunneling underneath existing operating railway, the traditional risk assessment method takes the settlement risk of shield tunneling underneath the railroad as the evaluation objective cannot determine the risk development trend. Therefore, a shield tunneling underneath railroad risk evaluation model based on set pair analysis was proposed.
Keywords:
Embankment and subgrade settlement; Propulsion speed; Risk evaluation; Rough set theory; Slurry pressure

Contacts :
0