#5197. Optimisation of life-of-mine production scheduling for block-caving mines under mineral resource and material mixing uncertainty

September 2026publication date
Proposal available till 08-06-2025
4 total number of authors per manuscript0 $

The title of the journal is available only for the authors who have already paid for
Journal’s subject area:
Earth-Surface Processes;
Geology;
Geotechnical Engineering and Engineering Geology;
Management of Technology and Innovation;
Places in the authors’ list:
place 1place 2place 3place 4
FreeFreeFreeFree
2350 $1200 $1050 $900 $
Contract5197.1 Contract5197.2 Contract5197.3 Contract5197.4
1 place - free (for sale)
2 place - free (for sale)
3 place - free (for sale)
4 place - free (for sale)

More details about the manuscript: Science Citation Index Expanded or/and Social Sciences Citation Index
Abstract:
This paper presents a methodology to integrate mineral resource uncertainty from scarce orebody sampling and material mixing uncertainty due to ore flow into the life-of-mine production scheduling of block caving mines. Geological uncertainty is integrated using a Sequential Gaussian Simulation workflow and material mixing uncertainty by simulating material flow using a Cone of Movement concept. A case study is presented in which the uncertainty-based workflow is compared with a deterministic workflow.
Keywords:
block caving; Life-of-mine production scheduling; mineral resource uncertainty; mixing uncertainty; uncertainty-based optimisation

Contacts :
0