#4851. Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study

August 2026publication date
Proposal available till 29-05-2025
4 total number of authors per manuscript0 $

The title of the journal is available only for the authors who have already paid for
Journal’s subject area:
Architecture;
Business, Management and Accounting (all);
Building and Construction;
Places in the authors’ list:
place 1place 2place 3place 4
FreeFreeFreeFree
2350 $1200 $1050 $900 $
Contract4851.1 Contract4851.2 Contract4851.3 Contract4851.4
1 place - free (for sale)
2 place - free (for sale)
3 place - free (for sale)
4 place - free (for sale)

More details about the manuscript: Science Citation Index Expanded or/and Social Sciences Citation Index
Abstract:
Digital Fabrication (DFAB) is a systemic innovation with low adoption rates in architecture, engineering and construction (AEC) projects. Managing requirements of a new design process is one major challenge for the increased DFAB adoption. For other types of innovations, practices such as Building Information Modelling (BIM) and Early Contractor Involvement (ECI) improve design management by integrating process, information and organisation in construction projects. However, the relationship between DFAB, BIM and ECI has not yet been studied thoroughly. This study undertakes a comparative study of four DFAB adoptions in AEC projects with varying levels of BIM and ECI implementation. The design processes of DFAB are traced using swimlane process diagrams. This work illustrates the proposed relationships in DFAB adoption in design using a fishbone diagram. This work concludes with potential future research in design management for digital fabrication, including five takeaways for practitioners to adopt and manage DFAB in the design process of construction projects.
Keywords:
BIM; comparative case study; design management; Digital fabrication; early contractor involvement

Contacts :
0